JUST IN: KPC Completes Second Phase of Nairobi-Eldoret Pipeline Upgrade, Boosting Fuel Flow Rate to 515 M³ per Hour
The project, which began in 2022, features a fully-fledged pump station at Ngema (PS22) equipped with two mainline pumps operating in a 1+1 mode (one pump operating and another on standby). Read More